CTE Malaysia

TBM SUPPLY SPECIALIST

CREG supplies Slurry TBM for Wuhan Metro Line 6

Press Releases

  

 

CTE Ltd is pleased to announce that CREG have been awarded a contract to supply a Slurry TBM for Lot 10 of Wuhan Metro Line 6. The TBM, cutterhead diameter 6.5m, will excavate the Qinwu Running Tunnels with lengths of 1732m and 1691m. The tunnels pass under the Han River for approximately 350m. The tunnels will have a finished internal diameter of 5500mm.

With the recent acquisition of Aker Wirth tunnel-boring and shaft-boring technology CTE are now in a position to offer the full range of EPB, Slurry and Hard Rock TBMs.

CTE Ltd was established with the sole purpose of marketing and presenting the Tunnel Boring Machines manufactured by CREG (formally CREC-TBM) and to provide full support to users of CREG TBMs in terms of Field Service and after sales activities.

All enquiries should be addressed to This email address is being protected from spambots. You need JavaScript enabled to view it.

Newsletter Subscription

Subscribe to our newsletters and get the
latest press releases directly to your inbox

Contact Us

All enquiries should be addressed to the International Operation Office, Malaysia

Tel +60  3 7954 0314 (International)
Email : enquiries@cte-limited.com

Contact Us

Social Networks

Follow us and don't miss important updates from us in the future