CTE Malaysia

TBM SUPPLY SPECIALIST

Projects undertaken by CTE Limited or it's related companies in China

Shenzhen Metro CR52-65

CREG have supplied 14 TBM’s for work on Line 9 of the Shenzhen Metro. These machines started working in 2013. The geology is Gravelly Sand and Clay, but with some lengths where granite is encountered.

Read more...

Chengdu Metro Lines

CREG have supplied 30 TBM’s for excavation and extension work in five different metro lines in Chengdu over the last 2 – 3 years.

Read more...

ChongQing Metro – Line 6

CREG supplied 9 TBM’s for work on Line 6 of the ChongQing Metro. Of the total 37 km of tunnel in the whole project, 13.7 km were excavated with machines supplied by CREG.

Read more...

Tao River Water Diversion

This machines was used on the first phase of the Water diversion project on the Tao river, in Gansu Province. The total length of the project is 13 km and is through abrasive sandstone. A rock excavating single shield working in open mode was used.

Read more...

Metro Tunnels in China

CREG have supplied machine for the construction of Metro tunnels in many cities in China, These include ….

Read more...

Newsletter Subscription

Subscribe to our newsletters and get the
latest press releases directly to your inbox

Contact Us

All enquiries should be addressed to the International Operation Office, Malaysia

Tel +60  3 7954 0314 (International)
Email : enquiries@cte-limited.com

Contact Us

Social Networks

Follow us and don't miss important updates from us in the future